ELIMINATION OF BLACK SPOTS VIA FLYOVER AND BRIDGE CONSTRUCTION

Providing long term improvement to 7 (seven) identified Black Spots at isolated locations on four lane Jetpur-Gondal-Rajkot Section between Km. 117.000 to Km. 185.000 on NH-8B (Now NH-27) in the State of Gujarat on EPC Mode.

http://www.e5company.com/wp-content/uploads/2017/07/elimination-black-spot1.jpg
http://www.e5company.com/wp-content/uploads/2017/07/elimination-black-spot3.jpg
http://www.e5company.com/wp-content/uploads/2017/07/elimination-black-spot4.jpg
http://www.e5company.com/wp-content/uploads/2017/07/elimination-black-spot5.jpg
http://www.e5company.com/wp-content/uploads/2017/07/elimination-black-spot12.jpg

Project: ELIMINATION OF BLACK SPOTS VIA FLYOVER AND BRIDGE CONSTRUCTION

Title:

Description:

ELIMINATION OF BLACK SPOTS VIA FLYOVER AND BRIDGE CONSTRUCTION

Providing long term improvement to 7 (seven) identified Black Spots at isolated locations on four lane Jetpur-Gondal-Rajkot Section between Km. 117.000 to Km. 185.000 on NH-8B (Now NH-27) in the State of Gujarat on EPC Mode.

elimination-black-spot1
elimination-black-spot3
elimination-black-spot4
elimination-black-spot5
elimination-black-spot12

About the project

Project Name: Providing long term improvement to 7 (seven) identified Black Spots at isolated locations on four lane Jetpur-Gondal-Rajkot Section between Km. 117.000 to Km. 185.000 on NH-8B (Now NH-27) in the State of Gujarat on EPC Mode.

Country & Location Within Country: Km. 117.00 to Km. 185.00, NH-27, Rajkot District, Gujarat, India.

Name of Employer: National Highway Authorities of India.

Status of The E5 Company in Project: Sub-Contractor.

Details of Works Carried Out: Excavation for drainage, shuttering & centring, M15, M25, M35 & M40 Grades of cement concrete for various works including PCC, raft and walls of drain,  Approaches to flyover, Construction of foundations, piers, Pillars, pier caps, Girder launching, Wet Mix Macadam, Granular sub Bade, Dense Bituminous Macadem, Bituminous Concrete, erection of crash barriers, signage, reflectors and lane marking.

Project Status


  Start Date: 18th Aug 2017

 Stipulated Completion Date: 9th Feb 2018

 Actual Completion Date: 20th Dec 2017