Construction of single cell (4m X 3m) box type Daang Minor Bridge at RD.13.200 & 3 Cell (4m X 3m) Box type Nigana Feeder at RD.13.250 on Bhiwani-Mundal-Jind-Karnal road New NH-709A in the State of Haryana.

http://www.e5company.com/wp-content/uploads/2017/07/box-type1.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type2.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type3.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type4.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type5.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type6.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type9.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type10.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type-minor-bridge-1-1.jpg
http://www.e5company.com/wp-content/uploads/2017/07/box-type-minor-bridge-2-1.jpg

Project: BOX TYPE MINOR BRIDGE

Title:

Description:

BOX TYPE MINOR BRIDGE

Construction of single cell (4m X 3m) box type Daang Minor Bridge at RD.13.200 & 3 Cell (4m X 3m) Box type Nigana Feeder at RD.13.250 on Bhiwani-Mundal-Jind-Karnal road New NH-709A in the State of Haryana.

box-type1
box-type2
box-type3
box-type4
box-type5
box-type6
box-type9
box-type10
box-type-minor-bridge-1
box-type-minor-bridge-2

About the project

Project Name: Construction of single cell (4m X 3m) box type Daang Minor Bridge at RD.13.200 & 3 Cell (4m X 3m) Box type Nigana Feeder at RD.13.250 on Bhiwani-Mundal-Jind-Karnal  road New NH-709A in the State of Haryana.

Name of Employer: National Highway Authorities of India.

Status of The E5 Company in Project: Main Contractor.

Country & Location Within Country: Jind district, NH-709A, Haryana, India

Number of Staff Employed: Project Director, Project Manager, key engineers and management personnel (7), Skilled labour (22), Unskilled Labor (45), Drivers and Operators (17).

List of Equipment Employed: List of Equipment Employed: Flory (1), Swing Stetter Cement Concrete Plant, (1), Wet Mix Plant (1), Batch Mix Plant (1), Concrete pump (1), Vibrator(1), back Hoe Loader (3), Vibratory Rollers (2), Soil Compactors (2), Tippers (10), Excavator (1), Vehicles (4).

Details of Works Carried Out: Excavation & earthwork in foundation, Black filling with granular materials, Brickwork, M15-grade cement concrete below foundation, M-20 Grade cement concrete in foundation,  M-35 cement concrete mechanically mixed and vibrated in main drain, Centring and shuttering,  RCC structure from high strength TNT Fe-500 bars including bending binding & positioning, Drain spouts, Providing M-40 Grade  RCC crash barriers & hand rails, Synthetic enamel paint work, provision of weep holes  wing walls, constructing filter media, tack coat & bituminous emulsion,   DBM works, BC works, providing reflective pavement markers , construction of embankments.

Project Status


  Start Date: 28th March 2017

 Stipulated Completion Date: 28th March 2018

 Actual Completion Date: 3rd Jan 2018